The concept was developed in the UK working to UK and EU building codes of practice. There is a need for fast build demountable car parking systems around the world, the revolutionary “K2” car parks system has already been introduced to FIFA world up and IOC organisers as a way of reducing capital outlay, increasing revenue and maintaining the asset for reuse at future games around the world.
EXCLUSIVE WORLDWIDE PATENT
The system is a world first as no other concrete decked car park is truly permanent but demountable. The “K2” system uses a combination of steel, precast and in-situ concrete allowing the construction to be infinitely adaptable to local building practices, it also combines aluminum to produce a light weight system. The innovative design allows the system to be built anywhere in the world utilising local material and construction methods and can be tailored to meet client’s needs.
CONSTRUCTION PHASING
A typical 200 space car park can be completed in 20 days Steel work erected in phases of typically 1 day Modular system allows for specific design constraints and future expansion. Steel structure retains a contemporary appearance. Customer experience: good ambience, security and accessibility.
RAMP SOLUTIONS
No matter the size or scale of the build, we will create a bespoke Solution for you. Site specific design for ramp layout, gradient and details. Typical ramp surface is either open grid floor or concrete